Available now24/7 Emergency
Request a Quote
Orihuela Costa, Alicante

EV Charging for Communities in Orihuela Costa

Orihuela Costa is, alongside Torrevieja, one of the places in the province with the most demand for community charging points, due to the huge number of estates and residents associations with collective garages in La Zenia, Cabo Roig, Villamartín and Playa Flamenca. The challenge is usually coordinating with large communities, many of British majority, and with property managers.

Free Quote

Request your no-obligation quote

We handle the whole process: the community notification, the design of the line with an individual meter per space and, when worthwhile, a collective pre-installation for the whole garage. We serve foreign owners in English and coordinate the whole project with the community.

Working with the managing agent

In the communities of La Zenia, Cabo Roig and Villamartín the real contact is almost never the neighbour: it is the managing agent, and the owners' meeting often convenes once or twice a year. Presenting complete documentation first time is what stops the matter sitting for six months until the next meeting.

So we prepare the whole pack: technical description of the installation, planned route through the common areas, power requested and the individual metering arrangement. Where the community is predominantly British we supply it in English too. With that, the agent can process a prior notification without convening anything.

Photos from our own installations

Our own jobs, photographed on site. Our photographs, not stock images.

Tools and cable drums laid out on a house terrace before the installation starts
Materials and tools on site before we start: cable drums, conduit and the earth cable.
Open meter cabinet showing the metering units and the corrugated conduits of the supply lines
The meter cabinet is where the new line starts — that is where we check the available supply before quoting.
Electrician pulling cable in an underground garage, with a ladder, cable drum and tool bag
Running the cable through the garage to the parking bay.
Electrician wiring the surface-mounted protection box next to the already-mounted charger
A dedicated protection box beside the charger, with the RCD a charging point is required to have.

What's included?

Community notification included
Individual meter per space
Collective garage pre-installation
Centralised trunk routing
Dynamic load management
For property managers

How we work

1

Site visit

We study the garage, the common panel and the distance to your space.

2

Notification

We handle the community notification and paperwork.

3

Installation

We fit the line, the individual meter and the charging point.

4

Legalisation

We certify and legalise the installation in line with regulations.

Price Guide

From €800 per point (installation + equipment). Closed quote after the site visit.

Nearby areas

EV Charging for Communities in other areas

Why Choose Us

5.0

Google rating 5.0 / 5

15 reviews · Read the reviews

  • 24/724/7 Availability
  • 4We answer in Spanish, English, Russian and Ukrainian
  • Licensed Electrician

Frequently Asked Questions

Yes, we serve the communities of La Zenia, Cabo Roig and Villamartín in English and prepare the documentation for the board meeting and the charging project for the whole community.