Available now24/7 Emergency
Request a Quote
Torrevieja, Alicante

EV Charging for Communities in Torrevieja

In Torrevieja, with its huge stock of urbanisations and resident communities, installing charging points in collective garages has become a growing demand, especially among the many foreign residents who arrive already with an electric car. The challenge in these urbanisations is usually the age of the common installation and the need to coordinate with large communities whose boards meet only a few times a year.

Free Quote

Request your no-obligation quote

We handle the whole process: the community notification, the design of the line with an individual meter per space and, when worthwhile, a collective pre-installation for the whole garage, which is especially worthwhile in Torrevieja given the volume of spaces electrified at once.

What the owners' meeting has to approve, and what it does not

This is the question that delays these installations most in Torrevieja. To install a charging point for private use in your own parking space, the Horizontal Property Act requires only that you notify the association in advance; no vote is needed and the association cannot prevent it. The cost falls on the owner installing it.

A collective pre-installation for the whole garage is a different matter, and does require a community resolution because it affects common elements and their budget. We prepare the prior notice for you with the technical description of the installation, which is what the managing agent needs to close the matter without waiting for the next meeting.

Photos from our own installations

Our own jobs, photographed on site. Our photographs, not stock images.

Tools and cable drums laid out on a house terrace before the installation starts
Materials and tools on site before we start: cable drums, conduit and the earth cable.
Open meter cabinet showing the metering units and the corrugated conduits of the supply lines
The meter cabinet is where the new line starts — that is where we check the available supply before quoting.
Electrician pulling cable in an underground garage, with a ladder, cable drum and tool bag
Running the cable through the garage to the parking bay.
Electrician wiring the surface-mounted protection box next to the already-mounted charger
A dedicated protection box beside the charger, with the RCD a charging point is required to have.

What's included?

Community notification included
Individual meter per space
Collective garage pre-installation
Centralised trunk routing
Dynamic load management
For property managers

How we work

1

Site visit

We study the garage, the common panel and the distance to your space.

2

Notification

We handle the community notification and paperwork.

3

Installation

We fit the line, the individual meter and the charging point.

4

Legalisation

We certify and legalise the installation in line with regulations.

Price Guide

From €800 per point (installation + equipment). Closed quote after the site visit.

Nearby areas

EV Charging for Communities in other areas

Why Choose Us

5.0

Google rating 5.0 / 5

15 reviews · Read the reviews

  • 24/724/7 Availability
  • 4We answer in Spanish, English, Russian and Ukrainian
  • Licensed Electrician

Frequently Asked Questions

Yes, in Torrevieja we regularly work with large urbanisations and property managers. We prepare the documentation for the board meeting and the charging project for the whole community.